Tianjin North Gold Jewelry Park Phase I Project

Project Title: Phase I Project of Tianjin North Gold and Jewelry Park Phase 1: Preliminary Design and Construction Period: 2012.1-2013.12
Major equipment: cranes, building materials, exterior wall decoration materials, elevators, waterproof materials, pai.......

What kind of face does Kumho have?

A long time ago, there was a story of Kumho, which was known to all people on earth. Instead, the protagonist of the story, Kumho, has two faces at different times, either low-key or high-profile, if they are stitched together with a movie montage, the feeling.......

Global Top 75 tires released in China 29 finalists

In this newsletter, “European Rubber Magazine” recently released the 2011 annual list of 75 global tires. Bridgestone has surpassed Michelin and Goodyear for three consecutive years and continues to lead the world tire industry. China's 29 comp.......

Qingdao Taiwan Garden Construction Project

Qingdao Taiwan Garden Construction Project (2011-2013, 800 million)
Project Name: Qingdao Taiwan Garden Construction Project Progress Stage: Construction Preparation Construction Period: 2011.9-2013.1
Major equipment: cranes, fire-fighting facilities.......

New progress in the field of optical inspection

[ China Instrument Network Instrument Development ] Recently, the Institute of Advanced Sensing and Intelligent Systems of the Institute of Intelligence of the Chinese Academy of Sciences has made new progress in the field of surface plasmon resonance optical detection. The r.......

Orders for mainframes and generator sets in Zhenjiang

On August 31, Zhenjiang Zhongchuan Equipment Co., Ltd. and Fujian Guanhai Shipbuilding Industry Co., Ltd. signed a contract for the supply of two 23,000-ton bulk carriers.
According to the contract, the company will provide two 6S35MC7 low-speed machines and four 5L16/24 diesel generator s.......

Sichuan Silk School New Campus Teaching Building Project

Project Name: Teaching Building Project of New Campus of Sichuan Silk School (Update) (2011-2012)
Progress phase: Engineering design and construction period: 2011-2012 Major equipment: cranes, fire-fighting facilities, security facilities, water supply an.......

Chengdu Sanhe Longjing Court and other construction projects

Chengdu Sanhe Longjingyuan and other construction projects (2011-2012, 150 million yuan)
Region: Sichuan Progress Stage: Construction Preparation Construction Period: 2011-2012 Main Equipment: Fire-fighting facilities, cranes, excavators, fans, speed-up d.......