Hydrant pump operation and routine maintenance

    Fire equipment operation procedures
  
A? Fire alarm
  
a system self-test: related operations.
  
B? Fire pump
  
a Automatic start: fire pump control cabinet in the "automatic" position, when the "fire danger", crushed "fire hydrant alarm box" alarm on the floor, linkage sound and light alarm, fire pump automatically start.
  
b Manual start: In the fire pump control cabinet to select the "automatic / manual" position "manual", press the start button to "manually" start the fire pump.
  
C? Spray pump
  
a) Automatic start: The spray pump control cabinet is in the "automatic" position. When the floor fires, the spray head bursts, and the water flow alarm activates the acousto-optic alarm and the spray pump starts automatically.
  
b) Manual start: Set the "Auto / Manual" selector switch to the "Manual" position on the spray pump control panel and press the start button to start the spray pump "manually".
  
Hydrant pump work procedures
  
Control room equipment maintenance work procedures
  
A? Control room equipment by the control room maintenance workers responsible for maintenance.
  
B? Mechanical and Electrical Supervisor in December each year to develop the next year, "Fire Equipment Inspection and Maintenance Schedule", and equipment operation to develop in the repair, overhaul plan.
  
C? Control room maintenance workers according to the requirements of the maintenance schedule for maintenance, and maintenance records will be recorded in the appropriate record.
  
D? After the fire equipment repair must restore the original state, not free to change the original equipment, wiring.
  
E? Control room equipment failure to repair generally not more than 8 hours, if not resolved within 8 hours of the fault should be the cause of the malfunction, to resolve the time
  
Report to the management office, deadline to resolve.
  
F? Occurred at night, does not affect the user life, work, will not have serious consequences of the control room equipment failure, you can control the early morning maintenance room maintenance workers.